Mukilteo Staybridge Suites

The Mukilteo Staybridge Suites have a unique post tensioning floor system in that it is 15 inches thick, but proved to be no match for the PTC detailers. With a 15 inch slab and no drop caps, special studrails had to be ordered to prevent punching shear forces over the columns. PTC works closely with Deacon, a studrail supplier, to make sure the properly sized studrails make it to the job site in a timely manner along with easy to understand drawings for installation. This project opened in 2009.

mukilteostaybridge.jpg